Interested in Leasing or Selling Your Land for Solar or Distributed Energy Resources (DER)?
If you’re considering leasing or selling your land for a solar project, here’s what you need to know.
For Members:
What Four County EMC Does (and Doesn’t) Do
-
Four County EMC does not develop solar farms or buy electricity from them directly.
-
Energy from commercial solar farms in our territory is purchased by our wholesale power provider, NCEMC.
Learn more: NCEMC Renewables -
We do not transport (wheel) power across our system. Power generated here must stay in our territory.
Key Facts About Solar Interconnections
-
The process takes time. Even in the best-case scenario, it can take years before a solar farm starts producing energy.
-
It’s expensive. Interconnecting to the grid can cost tens or even hundreds of thousands of dollars.
-
Scale matters. Less than 50 acres? It may not make economic sense to build a solar farm.
-
Location isn’t everything. Being close to a substation or 3-phase line doesn’t guarantee suitability.
-
It’s a long-term commitment. These leases often last 20–30 years. Talk it over with your family before signing anything.
Our Recommendations for Landowners
-
Talk to multiple developers. Aim for at least two.
-
Ask smart questions:
-
Are you licensed in North Carolina?
-
Have you developed solar farms here before?
-
Have you worked with Four County EMC or any NC electric co-op?
-
Can I speak with other landowners you’ve worked with, even if the project didn’t go through?
-
-
Do your research. Check developers with the Better Business Bureau.
-
Need feedback on a developer? While we can’t recommend one, we’re happy to share other members experiences with any developer we’ve worked with.
For Developers:
Important Notes
-
Four County EMC is not a solar developer and does not buy solar energy directly.
-
All energy must be sold to NCEMC, not to Four County EMC.
Learn more: NCEMC Renewables -
No wheeling: Energy must stay in our distribution area.
-
Proximity isn’t enough: Being near substations or 3-phase lines does not guarantee approval.
-
Impact Study is required for all solar farm applications. Costs usually start at $25,000+ and depend on size and complexity. The study may impact your project’s scale or viability.
Developer Application Process
-
Download and complete the Application & Interconnection Agreements.
-
Submit the completed forms with all required documentation to SolarApplication@Fourcty.org
-
Initial Review: Four County EMC will respond within a reasonable time period with any questions.
-
Impact Study Process:
-
Conducted by an external engineering firm.
-
Timeline: 8–16 weeks.
-
Developer pays upfront for the study.
-
After payment, we’ll send you a list of everything needed to start the study.
-
-
If the solar farm affects the DEP transmission system:
-
Four County EMC will coordinate with NCEMC and the developer for a DEP “Affected System Study.”
-
Developer is responsible for this cost as well.
-
-
Results: The Impact Study will outline any issues and the estimated cost of interconnection.